Open the books

RAW FILE: SCHEDULE.md, as written during the jam

Source prep/SCHEDULE.md in the jam repo. Last git commit of this file: 2026-11-10. About 2,926 words. Scrubbed only for private details and one line about another entrant. Mistakes left in on purpose.

Jam schedule: Thu Nov 12 00:00 to Sun Nov 15 20:59 ET

All times ET (EST, UTC minus 5; daylight time ended Nov 1). itch shows the deadline as 2026-11-16 01:59 UTC: same moment. Our deadline is Sun 4:00 PM. The 5 hours after are buffer, not work time.

The crew

AgentMachineOwns
Producerlaptop (hub chat)The plan, cuts, the lock calls, the dev log editor, messages to Don
Editor driverlaptopThe only agent that drives the Unreal editor through MCP. One driver, so prompts never collide. Others hand it tickets.
Gameplay coderlaptop (files)Blueprint logic, built from Python editor scripts in git that the driver runs. Blueprint only, no C++: tower 2 has no compiler and the packaging and hot spare plan depend on a content only project (MCP-RUNBOOK).
Level designerlaptop (files, then driver)Layout, blockout, lighting plan, guidance
Art leadtower 1Style frames, textures, image to 3D, decals, UI art (FLUX, FLUX.2 klein, TRELLIS.2, critics)
Audio leadtower 1Music (ACE-Step), SFX (see SUBMISSION-KIT on Stable Audio; Kenney CC0 library as sourced filler), voices (Chatterbox, Kokoro), mix
Build and QAtower 2, plus the laptop for videoPackaging, clean machine runs, bot playtests, perf on AMD, hot spare editor. Video capture and encode run on the laptop (record-obs.ps1 needs NVENC; tower 2 is AMD and can't show the game window headless).
Review panelanyFresh eyed reviewers per STANDARDS.md; they never review their own work
ScribeanyDev log notes every 2 hours from git, tickets and the asset registry

Tower 1's GPU is shared: the critic model and ComfyUI can't run at once. The lab GPU lock decides; art and audio queue through it.

Each agent runs at its job's tier (studio ORG.md, "Helpers and effort"; Don, 2026-11-10). Opus for judgment: the producer, the design agent, the review panel, and the leads' look and sound picks. Sonnet (worker) for scoped tickets with a check: Blueprint scripts, blockout scripts, batch specs, dev log drafts. Haiku (scout, log-reader) for searches, overnight log triage, the scribe's gathering, and checking that files exist and measure right. A job moves up one tier only after its check fails twice. Fable 5.2 is for Saturday only (see Sat Nov 14).

Golden rules for the four days

Milestones

#WhenMilestone
M0Thu 00:00Kickoff: theme-day/DESIGN.md written from Don's pick (done by 01:30); blank Blueprint project created
M1Thu 02:00Empty project packages and runs on tower 2 with our settings (proof of the pipeline)
M2Thu 09:003 real-look style frames (FLUX.2 klein from the style lock, canon checked); studio picks one. Internal; Don may glance.
M3Thu 14:00Core verb works in greybox on pad, keys and touch (internal only)
M4Thu 22:00Playable greybox loop start to finish (internal); packaged by 23:00; first golden
M5Fri 12:00First packaged build with the real look in the first zone
M6Fri 18:00Don playtest 1 (three inputs, 30 min)
M7Fri 22:00Feature lock
M8Sat 14:00Don playtest 2 (full game, real art everywhere)
M9Sat 20:00Content lock (all art, audio, voice in)
M10Sun 10:00Release candidate packaged; code freeze
M11Sun 13:00Video, dev log and submission kit final
M12Sun 14:00 to 16:00Don uploads and submits

"Greybox" at M3 and M4 is internal. Don never gets a link to it (show the look first). His first build at M6 has real art in at least the first zone, and anything still gray is named in the message.

Wed Nov 11 (theme day)

Morning: the engine gate (MCP-RUNBOOK.md, "Engine choice"). 5.9.0 if it passes every check, else 5.8.4; Don leans to 5.9. Record the result in MCP-RUNBOOK.md before 2 PM, so the theme day prompts name the right engine. Then see PLAYBOOK.md. Don's only job: pick at 4:20 PM (or say "your call"). Wednesday ends at the pick: the design, level layout and prompt sheets are written from 00:00 Thursday, so nothing that looks like game content predates the window (rule 7h). At 6 PM the producer arms the midnight kickoff as a one time check in, so nobody has to be awake.

Thu Nov 12: build the core

TimeLaptop (Unreal, MCP)Tower 1 (AI gen)Tower 2 (build, test)Don
00:00Producer and design agent write theme-day/DESIGN.md from the pick (by 01:30; fresh reviewer by 02:00). Driver creates the blank Blueprint project in game/, project settings from MCP-RUNBOOK, Enhanced Input with pad, keys and touch maps01:30: style frame prompts from DESIGN.md go in the queuePull project skeletonasleep
01:00Player pawn and camera, first passLook dev batch 1 (environment and key props, 3 directions)Package the empty project (Development, app local prerequisites)asleep
02:00Core verb prototype beginsBatch 1 critics (qwen3-vl, HPS)M1: package it; the laptop smoke tests the zip; time itasleep
03:00 to 07:00Core verb prototype; greybox of the level from the layout sketchMusic sketches (2 directions), SFX first list (one per action)Bot playtest harness pointed at the project (input replay)asleep
08:00Driver check in; producer reviews overnight outputStyle frames: FLUX.2 klein from the style lock, canon first, critics; no greybox in any frameOvernight results reportasleep
09:00M2: studio picks the lookLock the style bible; hero asset list goes into the queueoptional 5 min: glance at the chosen frame
10:00Core verb tuning (feel targets)Hero asset 1 to 3: image, then TRELLIS.2, then cleanup
11:00Core verb tuning; touch on screen controlsHero assets continuePackage attempt 2
12:00Level blockout zone 1Materials pass 1 (AI PBR plus CC0 filler)Perf check on AMD
13:00Level blockout zone 2Music theme draft (ACE-Step, 3 takes)
14:00M3: core verb on all three inputs; review panel plays itSFX batch 1 (8 takes each, auto pick; tool per SUBMISSION-KIT's Stable Audio note)Input test: pad, keys, touch
15:00Fix review findingsHero assets 4 to 6
16:00Level blockout zone 3; goal and fail statesHero assets continue
17:00Win and lose flow, restart in one secondMusic: pick the theme, make the second intensity
18:00Main menu, pause, settings (volume per channel, reduce motion, reduce flashing)UI art (no model lettering; real fonts)
19:00Loop end to end in greyboxSFX batch 2
20:00FixVoice bible and line list (if the design has voice)
21:00FixPackage attempt 3
22:00M4: full loop playable. Review panel playsBot playtest: can it finish? time to finish
23:00Commit, pushOvernight queue: rest of hero assets, environment set, music stemsFirst golden build

Fri Nov 13: the look goes in, features lock

TimeLaptopTower 1Tower 2Don
00:00 to 07:00Idle or light jobs (lighting builds if any)Overnight art and audio queueBot playtests on golden (stuck points, crash hunt); package nightlyasleep
08:00Triage overnight resultsCritics on overnight assets; reject and requeueReport
09:00Import hero assets into zone 1; lighting pass zone 1Requeue rejects
10:00Zone 1 dressing; Niagara pass zone 1Environment set continues
11:00Music and SFX hooked to events zone 1Voices (if any): record, pick by Whisper and earPackage
12:00M5: real look in zone 1 packagedSmoke test (zip to the laptop), perf AMD
13:00Zone 2 assets and lightingZone 3 assets
14:00Zone 2 dressing; signature moment build
15:00Signature moment build
16:00Review panel full pass (all STANDARDS sections)Flash check, colorblind sheet on captures
17:00Fix the worst findings; package for DonPackage, golden 2; unzip to the laptop's builds folder for Don
18:00M6: Playtest 1, 30 min. Pad first, then keys and mouse, then touch screen. What to try comes in one message.
19:00Fold in Don's notes (each one becomes a STANDARDS rule if new)send notes by text or voice; create the itch game page as a Draft
20:00Fix
21:00Fix; producer runs the cut list against what's left
22:00M7: feature lock. No new mechanics after this.Overnight queue: zone 3 dressing assets, music final stems, SFX batch 3Package, golden 3
23:00Commit, pushOvernight bot playtests

Sat Nov 14: content and audio

Fable 5.2 runs Saturday's integration and polish push, on Don's plan resets (Don, 2026-11-10). The second reset is Sunday insurance. Thursday's kickoff night and Friday run on normal limits.

TimeLaptopTower 1Tower 2Don
00:00 to 07:00Light bakes if usedOvernight queueBots, nightly packageasleep
08:00TriageCritics, requeueReport
09:00Zone 3 dressing and lightingLast asset rejects
10:00Full audio pass: every action has a sound, music states, ambience per zoneMix stems
11:00Subtitles with speaker names (if voice); credits screen from the asset registry
12:00Review panel full passFlash and colorblind checks
13:00Fix; package for DonPackage, golden 4
14:00M8: Playtest 2, 30 min. The whole game on all three inputs. Then upload golden 4 to the Draft itch page as a placeholder.
15:00Fold in Don's notesnotes
16:00Polish: camera, feel, transitions (designed, never a bare fade)
17:00Polish; title screen and end screen. Video: first capture pass on the laptop from golden 4 (record-obs.ps1, 1080p60; the bot harness replays a scripted best run)
18:00PolishLoudness pass (peaks at minus 1 dBFS or lower)
19:00Last content in
20:00M9: content lock.Package, golden 5
21:00Bug list only; video rough cut on the laptop (ffmpeg, VIDEO.md)
22:00Bug list only
23:00Commit, pushOvernight: soak test (play for 2 hours), bots

Sun Nov 15: ship

TimeLaptopTower 1Tower 2Don
00:00 to 07:00idleidle (or video stills)Soak test, bots, nightly packageasleep
08:00Crash and blocker fixes from the nightReport
09:00Fixes
10:00M10: release candidate. Code freeze.Package RC; smoke test from a fresh folder; zip TeamName_GameName.zip; size check under 1 GB
10:30Review panel plays the RC (STANDARDS full pass); fixes only for blockersRC run on all three inputs; perf AMD
11:30Spare editor on standbyRC check, 20 min. Play the RC from the laptop's builds folder. Say ship or name a blocker.
12:00Blocker fix only if Don named one (then repackage by 12:45). Video final capture and cut on the laptop from the RC
12:30Fresh reviewer runs the kit's pre upload checklist on the RC, video file and dev log text
13:00M11: video, dev log and kit final
13:30Read the dev log (15 min) and approve
14:00Upload the video to YouTube as unlisted. Publish the dev log on the itch page. Replace the placeholder zip with the RC zip.
15:00Kit's post upload checklist from a logged out browser: page opens, zip downloads and its hash matches the RC, video plays, dev log opens. Then Don submits.Click Submit on the jam page, fields pasted from SUBMISSION-KIT
15:30Screenshot the "submitted" page
16:00Done.
16:00 to 20:59Buffer. If anything failed above, fix and edit the same entry (one submission only, rule 2; itch allows edits until the deadline)

Hard stop: if we are not submitted by 6:00 PM, Don submits the last golden as is.

When Don is needed (all of it)

WhenWhatTime
Done 2026-11-09Joined the jam; name and Epic email recorded.
Before Wed 2 PMIn prep\toolcheck, run claude once: log in, trust the folder, approve unreal-mcp (MCP-RUNBOOK).5 min
Before Wed 2 PMUpload rehearsal: upload the ToolCheck zip (about 355 MB) to a throwaway Draft itch page and note the time (RISKS 2 and 14).15 min
Done 2026-11-10Paused for the jam: tower 1's byok-watch.timer, the laptop's three "Studio nightly jobs" tasks and "Studio dashboard refresh". The backup, queue agents and tower 2 CI keep running. Re-enable all of it on Nov 16.
Before Wed 2 PM (optional)Pause Windows Update on the laptop and tower 2 until Nov 16, so nothing reboots mid jam (a system setting, so only Don).5 min
Wed 4:20 PMPick one of three pitches, or "your call".5 to 25 min
Thu 9 AM (optional)Glance at the chosen look.5 min
Fri 6 PMPlaytest 1: pad, keys and mouse, touch. Then create the itch game page as a Draft (title, no files yet).40 min
Sat 2 PMPlaytest 2: the full game. Then upload golden 4 to the Draft page as a placeholder, so Sunday is a swap.45 min
Sun 11:30 AMRC check: ship or name a blocker.20 min
Sun 1:30 PMRead and approve the dev log.15 min
Sun 2 PM to 3:30 PMUpload video (unlisted), publish dev log, upload zip, click Submit.60 to 90 min

About 5 hours of Don across 5 days. He sleeps normal nights; nothing needs him between 11 PM and 8 AM.